Wednesday, November 25, 2015

Bananastrings Instructions



I just wanted to make sure that these instruction are posted for all to review.



Use and instructions are posted on www.bananastrings.net on the product news page, if you have any questions or concerns please contact us anytime.

The construction and functionality was key in the design.

Below are the techniques I have developed for the product.

Hope this helps. It took me a while to figure out these techniques but have been working for me for the last 3 years so they have been battle tested.


The holder works best with 20 lb test and up line.

Place the hook on the top(angled holder side) the hook should face opposite the logo.

Pull the leader inline with the appropriate line space.

Press the leader to the yellow base and firmly pull the leader through the rubber line holder from top to bottom and to finish press the line to the yellow base.

Use this technique for each rubber line holding section.



If you are using a line lighter than 20 lbs test.

Guide the line through the appropriate line space (the line does not grip as the heavier lines do).

To finish setting the leader place the end loop Knot into the Rubber line holder.

Retie loop if necessary so the Knot lines up in the middle of a rubber line holder unit.

Please take a moment to let me know how you heard of the product.

Thank you,

Andy Z...

No comments :

Post a Comment